Beach Replenishment work in Westende done by the dredger TSHD RIO
01|03|17
The beach replenishment work in Westende started at the heigh of the watersport center "De kwinte"
and will end at the heigh of the hotel Belle Vue at the end of the seawall .
The 180.000 m³ sand are injected with the dredger TSHD RIO .
The beach replenishment work are done on behalf of Maritime Dienst Kust ,
following the damage caused by the storm Dieter .
The work will be finished by Easter